Connection to the Electricity Grid
In order for the CHP Facility to export
or import electricity from the distribution or transmission
system, the applicant must:
-
- pay the associated connection and use of system
charges.
In order to obtain a connection offer, the developer
of a CHP plant must apply to the DSO
or the TSO,
as applicable.
The Transmission System Operator is currently ESB
National Grid, although it is intended that these functions
will be vested in a new body, EirGrid. ESB Networks
continues to act as Distribution System Operator, although
it is proposed that this function will also ultimately
be transferred to EirGrid. |